Checklist Completion

Overview of commissioning activity and operational status

Total Checklist Runs

342 Runs

Total Checklist Runs

Closed checklist run records

298 Runs

Closed checklist run records

Open Commissioning Actions

12 Actions

Open Commissioning Actions

Operational checklist metric limitation

  • System grouping is operational only and is not canonical facility/system scope.
  • Phase 0 limitation: System-level checklist ratios are unavailable pending numerator/denominator disclosure and persisted governed authority integration.

Checklist Runs by Status

342
Total Runs

Failed Checks by Asset

Total Failed
20
Highest
8
Pump P-101
Pump P-101
8
8
Control Panel CP-401
5
5
Filter Vessel FV-301
4
4
Chemical Feed Pump CFP-205
3
3

Operational activity status summary

Notice: Metric Suppressed

Operational activity and checklist pass ratio metrics are suppressed in Phase 0 pending integration with a persisted governed authority.

Open Commissioning Actions

IDDescriptionSystemSeverityAssigned ToStatusDate
CC-001Calibration certificate missing for flow transmitter FT-501Instrumentation & ControlHighCommissioning Team AOpen2026-03-15
CC-002Pump alignment check required for P-101Pumping SystemsMediumCommissioning Team BIn Progress2026-03-18
CC-003Electrical safety test pending for CP-401Electrical DistributionHighElectrical CommissioningOpen2026-03-16
CC-004Chemical feed system leak test incompleteChemical FeedMediumCommissioning Team CIn Progress2026-03-20

Template Library

Browse commissioning checklist templates with step counts and evidence requirements

View Templates →

Sample Run Detail

View a step-by-step commissioning run for pump P-101 with pass/fail and evidence tracking

View Run →